<acronym id="htbaz"></acronym>
        1. 青青草国产一区二区三区|日韩免费成年人入口|久久久久国产亚洲91|高清无码不卡AV|AV片成人免费区|久国产精品视频|婷婷丁香一区二区三区|免费看污片视频

          歡迎光臨河北漢洋機(jī)械制造有限公司網(wǎng)站!
          誠(chéng)信促進(jìn)發(fā)展,實(shí)力鑄就品牌
          服務(wù)熱線:

          15531706865

          產(chǎn)品分類

          Product category

          新聞資訊 / news 您的位置:網(wǎng)站首頁(yè) > 新聞資訊 > Construction/ Nomenclature

          Construction/ Nomenclature

          發(fā)布時(shí)間: 2020-02-13  點(diǎn)擊次數(shù): 1320次

          Caution: Always wear the appropriate protective gear (safety glasses, gloves, safety shoes,
          etc.) when working.
          TKP35H22 (Formerly TKP0350)
          Point of separation
          Moving end bracket
          Arm
          Horizontal divider
          Fixed end bracket
          Vertical divider
          Link
          3. Open the arms from each link on either side of the section to be disassembled.
          2. Insert a flat-head screwdriver into the gap between links and twist in the direction of the arrow to remove the pin from the hole.
          1. Support the other pins and bend the Cableveyor as shown to separate the ends.
          3. Align the ends. 2. Overlap the links, and insert the pins into the hole on one side.
          1. Push in the other side, insert the pin, and connect.

           
          2
           
           
           
          1) Opening arms             2) Removing or attaching arms       3) Closing arms
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
           
          Attach vertical dividers when filling your Cableveyor with cables & hoses. With the arms open, attach the vertical dividers as follows. 1. Hook one of the catches on the end of the vertical divider into the link. (circled red in photo on right) 2. Snap in the other catch by pushing the divider down in the direction of the arrow.
           
          *Either end of the vertical divider can be used. *Insert horizontal dividers into the vertical divider holes first, and then attach the unit to the link. (Note: This will require more than one vertical divider.)
           
           
           
           
          Pretension and sag may appear in the free span depending on the application. However, if selected within Tsubaki’s performance graph then there will be no problems with use.
           
           
           
           
           
           
           
           
          1. Machine travel end installation height (H’) should be Cableveyor height H + (10-30). 2. Cableveyor space height (h) is H + 100. 3. Install a guide rail. 4. The difference (ε) in the travel end and fixed end bracket attachment sides should be less than 4mm.  5. Use travel cables/hoses with excellent bending and wear properties. 6. Avoid using cables/hoses with wire braiding, as they are easily damaged.
          7. Cables/hoses wear easily when used stacked onto of one another. Lay horizontally or use horizontal dividers. 8. Set cables and hoses in the Cableveyor so that they have some play, and clamp both ends. 9. Remove foreign objects from guide rails, as they may cause damage. 10. The following are shipped unassembled and will require assembly when installing the Cableveyor.  (Moving/fixed end) plastic brackets  Vertical/horizontal dividers
           
          Any unevenness on the plastic bracket installation surface may damage the bracket. Ensure that the installation surface is as smooth as possible. Over-tightening the installation bolts can also damage the plastic bracket. Please use the following recommended tightening torque.
           
          Bolt Size Recommended Tightening Torque M6 2.6 N?m

          聯(lián)


          青青草国产一区二区三区|日韩免费成年人入口|久久久久国产亚洲91|高清无码不卡AV|AV片成人免费区|久国产精品视频|婷婷丁香一区二区三区|免费看污片视频

                <acronym id="htbaz"></acronym>